Question: A site 8 0 m 4 0 m will need to be dewatered for an excavation. The water level is 1 . 2 meters below
A site will need to be dewatered for an excavation. The water level is meters
below the ground surface, and the excavation needs to go meters below the surface. An
additional meters from the excavation is required in the drawdown for the safety of boiling.
Two wells will be used in this operation in the middle of the longsided edge. Determine the
flow Q in day for EACH well for a steady state operation. Given the bedrock is from
the ground, the hydraulic conductivity for the site is and the estimated radius of
influence is for this operation.