Question: A small driveshaf is produced using a CNC lathe. The machine operator's hourly rate is 56.6 per hour, The time taken to machine the driveshaft
A small driveshaf is produced using a CNC lathe. The machine operator's hourly rate is 56.6 per hour, The time taken to machine the driveshaft is 10 min. The order is for 930 units. If the material costlunit is $3.3 hunit and additional expenses for tooling are $850. Calculate the prime cost (upto one decimal place]