Question: A study was designed to examine the relationship between the TIME (in days) to complete a construction project. Data were collected on 15 projects and
A study was designed to examine the relationship between the TIME (in days) to complete a construction project. Data were collected on 15 projects and included the following independent variables: SIZE of the contract ($1,000s); BAD DAYS, number of bad weather days; STRIKE, a dummy variable whether or not there was a strike 1= strike, 0 = no strike; SUBCONTRACT, the number of sub-contractors involved. The correlation matrix is given below.
| Time | Size | Bad Days | Strike | Subcontact | |
| Time | 1.000 | ||||
| Size | 0.450 | 1.000 | |||
| Bad Days | 0.695 | 0.566 | 1.000 | ||
| Strike | 0.877 | 0.538 | 0.666 | 1.000 | |
| Subcontact | 0.844 | 0.662 | 0.728 | 0.814 | 1.000 |
What is the correlation between STRIKE and SUBCONTRACT
| A. .814 |
| B..877 |
| C..728 |
| D. 1.000 |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
