Question: A Swift high - efficiency cyclone is being compared with a Swift high - throughput cyclone of the same diameter. To evaluate the cost of
A Swift highefficiency cyclone is being compared with a Swift highthroughput cyclone of the same diameter. To evaluate the cost of the increased efficiency, estimate and compare thepower consumption for each. Assume K for the highefficiency model and K for the high throughput model. The volumetric gas flow rate is the same for both cyclones.