Question: A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 110

A table is assembled using three components, as
A table is assembled using three components, as
A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 110 units at the beginning of day 4, 150 units at the beginning of day 5, and 190 units at the beginning of cay 7 Receipts of 110 wood sections are scheduled at the beginning of day 2 There are 130 legs on hand. An additional 10 percent of the order size on legs is added for scrap allowance. There are 35 braces on hand Lead time in days) for all items is a function of each order quantity and is shown below Order Quantity Lead Time (days) 1-190 191-500 501-900 Table Wood sections (2) Braces (3) Legs (4) Prepare the material requirements plan using lot-for-lot ordering (Do not leave any empty spaces, input a wherever it is required) Production Schedule Beg. Inv. 1 2 6 Day Quantity 5 110 150 2 190 Bes Inve -1 Table ("Variable LT) Gross requirements Scheduled receipts Projected on hand uiz 0 Saved Help Save & EX Submit beg. Inv. Table (*Variable ET) Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 3 Bes- Inv. Woad Sections Gross requirements Scheduled receipts Projected on hand Het requirements Planned-order receipts Planned-order releases Beratny Braces Gross requirements Scheduled receipts Projected on hand Net requirements planned-order receipts planned-order releases

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!