Question: A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 8
A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship units at the beginning of day units at the beginning of day and units at the beginning of day Receipts of wood sections are scheduled at the beginning of day There are legs on hand. An additional percent of the order size on legs is added for scrap allowance. There are braces on hand. Lead time in daysfor all items is a function of each order quantity and is shown below.
tableOrder Quantity,Lead Time days
Prepare the material requirements plan using lotforlot ordering. Do not leave any empty spaces; input a wherever it is required.
tableBeg Production ScheduletableDayQuantityBeg. Inv.,tabletabletable
Table Variable LT
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Plannedorder receipts
Plannedorder releases
Wood Sections
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Plannedorder receipts
Beg. Inv.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock