Question: A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the

A time study was conducted on a job that contains

A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element 1 1 2. 3 Performance Rating 90% 85 110 100 0.44 1.50 0.84 1.10 2 3 4 5 6 0.50 0.43 0.45 0.45 0.46 1.52 1.47 1.51 1.49 1.52 0.89 0.77 0.83 0.88 0.80 1.14 1.08 1.13 1.26 4 1.16 a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) Element Average cycle 1 2 3 4 b. Find the normal time for each element. (Round your answers to 3 decimal places.) Element Normal time 1 2 3 4 C. Assuming an allowance factor of 19 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.) Element Standard time 2 3 4

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!