Question: A toble is ossembled using three components, as shown in the following product structure tree. The compony that mokes the toble wants to ship 1

A toble is ossembled using three components, as shown in the following product structure tree. The compony that mokes the toble wants to ship 190 units ot the beginning of day 4,220 units ot the beginning of day 5, and 250 units at the beginning of doy 7. Receipts of 190 wood sections ore scheduled ot the beginning of day 2. There are 230 legs on hand. An edditional 10 percent of the order size on legs is added for scrap allowance. There are 70 braces on hand. Lead time (in days) for all items is a function of each order quantity and is shown below.
\table[[Order Qubitity,Lead Tine (days)],[1-250,1],[251-700,2],[701-1,200,3]]
Prepore the material requirements plan using lot-for-lot ordering. (Do not leave any empty spaces; Input a 0 wherever it is requlred.)
Table (Variable LT)
Grosi requinerents
Scheduled nocelpts
Projected on hand
Net requirements
planned render necelpts
Planned onder neleases
Wood sections
Gross requircments
scheduled recerpts
projected on hand
Net requirenents
planind prder necelpts
Planned prder relenkes
Brsces
Grose ncqulronents
schedulad reEcspts
projected on hand
Net requincments?
Planned order recedpts
Planned onden releases:
Legs
1 exters safety stock
9ce. Inv.
scheduled receiper
projected on hand
NeE requirements
Planned orden recespte
hanned prden releases
(3) Leg (1) for-lot ordering. (Do not leave any empty spaces; input a o wherever it is required.)
 A toble is ossembled using three components, as shown in the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!