Question: A toble is ossembled using three components, as shown in the following product structure tree. The compony that mokes the toble wants to ship 1
A toble is ossembled using three components, as shown in the following product structure tree. The compony that mokes the toble wants to ship units ot the beginning of day units ot the beginning of day and units at the beginning of doy Receipts of wood sections ore scheduled ot the beginning of day There are legs on hand. An edditional percent of the order size on legs is added for scrap allowance. There are braces on hand. Lead time in days for all items is a function of each order quantity and is shown below.
tableOrder Qubitity,Lead Tine days
Prepore the material requirements plan using lotforlot ordering. Do not leave any empty spaces; Input a wherever it is requlred.
Table Variable LT
Grosi requinerents
Scheduled nocelpts
Projected on hand
Net requirements
planned render necelpts
Planned onder neleases
Wood sections
Gross requircments
scheduled recerpts
projected on hand
Net requirenents
planind prder necelpts
Planned prder relenkes
Brsces
Grose ncqulronents
schedulad reEcspts
projected on hand
Net requincments?
Planned order recedpts
Planned onden releases:
Legs
exters safety stock
ce Inv.
scheduled receiper
projected on hand
NeE requirements
Planned orden recespte
hanned prden releases
Leg forlot ordering. Do not leave any empty spaces; input a o wherever it is required.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock