Question: a. using johnsons rule for 2-madhine scheduling, the sequence is.... b. For the schedule developed using Johnson's rule, the total length of time taken to
a. using johnsons rule for 2-madhine scheduling, the sequence is....
Using Johnson's rule for 2-machine scheduling, the sequence is: Six jobs are to be processed through a two-step operation. The first operation involves sanding. and the second involves painting. Processing tim are as follows
b. For the schedule developed using Johnson's rule, the total length of time taken to complete the sixjobs (including the 2ndoperation) = __hours (enter your response as a wholenumber).