Using johnson's for 2 machine scheduling, the sequence is Scheduled Order....................Job 1.............................C 2...........................B 3...........................E 4..........................A 5.........................D 6........................F
Question:
Scheduled Order....................Job
1.............................C
2...........................B
3...........................E
4..........................A
5.........................D
6........................F
For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) = hours (enter response as a whole number).
Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting Processing times are as follows: