Using johnson's for 2 machine scheduling, the sequence is Scheduled Order....................Job 1.............................C 2...........................B 3...........................E 4..........................A 5.........................D 6........................F

Question:

Using johnson's for 2 machine scheduling, the sequence is
Scheduled Order....................Job
1.............................C
2...........................B
3...........................E
4..........................A
5.........................D
6........................F
For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) = hours (enter response as a whole number).
Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting Processing times are as follows:
Operation 1 (hours) Operation 2 (hours) Job 12 11 14 6. 9. 10 1
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Financial Accounting

ISBN: 978-0073526881

6th Edition

Authors: Libby, Short

Question Posted: