Question: a. Using the two tables, calculate the total function point count of Project Epsilon. b. Assume that historical data show that five function points can

a. Using the two tables, calculate the total

a. Using the two tables, calculate the total

a. Using the two tables, calculate the total function point count of Project Epsilon.

a. Using the two tables, calculate the total

b. Assume that historical data show that five function points can be done with one person-month and that six people have been assigned to work on Epsilon. What is the estimated project duration? c. If 20 people are available for the project, what is the estimated project duration? d. If the project must be complete in six months, how many people will be needed for the project?

Low Total Element Number of inputs Number of outputs Number of inquiries Number of files Number of interfaces _X 2+ x 3+ x 2+ x 5+ x 5+ Complexity Weighting Average High X 3+ X4 X 6+ x 9 X 4+ x 6 x 8+ x 12 x 10+ x 15 (2) 15 5 10 30 20 Software Project 13: Patient Admitting and Billing Inputs Rated complexity as low Outputs Rated complexity as average Inquiries Rated complexity as average Files Rated complexity as high Interfaces Rated complexity as average (12) (10) High Application of Complexity Factor Low Average x2 x 6 Total = Element Inputs Outputs Inquiries Files Interfaces = Count 15 5 10 30 20 X 4 30 30 = 40 = 360 = 200 660 x 12 = x 10 Total Complexity Weight Table 15 Number of inputs Number of outputs Number of inquiries Rated complexity low Rated complexity average 10 10 Rated complexity average Number of files 30 Rated complexity average Number of interfaces 50 Rated complexity high

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!