Question: a . Using these data, set up a c - chart with zequals 3 . The UCL Subscript c equals 2 0 . 3 8

a. Using these data, set up a c-chart with zequals3.
The UCL Subscript c equals
20.38 and the LCL Subscript c equals
0.82.(Enter your responses rounded to two decimal places.)
Part 3
b. Suppose that the next five samples had 12,14,13,18, and 20 irregularities. What do you conclude?
A.At least one of the sample points is outside the control limits comma so the process is not in control.
At least one of the sample points is outside the control limits comma so the process is not in control.
B.
At least one of the sample points is greater than the lower control limit, so the process is not in control.
C.At least one of the sample points is within the control limits comma so the process is in control.
At least one of the sample points is within the control limits comma so the process is in control.
D.
All of the sample points are within the control limits, so the process is not in control.
E.All of the sample points are within the control limits comma so the process is in control.
All of the sample points are within the control limits comma so the process is in control.
F.
At least one of the sample points is less than the upper control limit, so the process is not in control.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!