Question: A utility contractor is to install the sewer line whose plan and profile are given. The trench is to have the cross section shown in

A utility contractor is to install the sewer line whose plan and profile are given. The trench is to have the cross section shown in the figure.
a) Using the average-end method, determine the total volume of excavation in cubic yards needed to install the sewer line. Neglect the excavation of the manholes. Answer q,/d ?3
b) The pipe is surrounded by gravel. The depth of the gravel is 2 ft . The outside diameter of the sewer pipe is 13 inches. Determine the quantity of gravel needed for the sewer line. Answer ?d3
c) Determine the volume of backfill for the sewer line. Answer q,yd3
A utility contractor is to install the sewer line

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!