Question: A utility contractor is to install the sewer line whose plan and profile are given. The trench is to have the cross section shown in
A utility contractor is to install the sewer line whose plan and profile are given. The trench is to have the cross section shown in the figure.
a Using the averageend method, determine the total volume of excavation in cubic yards needed to install the sewer line. Neglect the excavation of the manholes. Answer d
b The pipe is surrounded by gravel. The depth of the gravel is ft The outside diameter of the sewer pipe is inches. Determine the quantity of gravel needed for the sewer line. Answer
c Determine the volume of backfill for the sewer line. Answer