Question: A vertical curve joins a - 1 . 4 % grade to a + 0 . 9 % grade. The Pl of the vertical curve

A vertical curve joins a -1.4% grade to a +0.9% grade. The Pl of the vertical curve is at station 89+00 and elevation 60.80 masi. The centerline of the roadway must clear a pipe located at station 90+40 by 0.80 m. The elevation of the top of the pipe is 61.40 mas. What is the minimum length of the vertical curve that can be used?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!