Question: A ) When the assembly line designed bg the engineers is running at maximum capacity, what is the efficiency of the line relative to its
A When the assembly line designed bg the engineers is running at maximum capacity, what is the efficiency of the line relative to its use of labor? Round answers to decimal places
B If the line were to be redesigned to operate at the initial units per day target, assuming no overtime will be used, what would be the maximum allowable cycle time? Develop an assembly line using the fewest possible workstations for the allowable cycle time What would be the efficiency of the new design?
CWhat about running the line at units per day? If overtime were used with the engineers initial design, how much overtime would be needed? Round to one decimal place
Dif the assembly line is to be redesigned to operate at units per day without using overtime, what is the maximum cycle time to meet this production rate? Round down "maximum cycle time" values to the next smallest integer
E Develop an assembly line layout with the fewest possible assembly line positions and fewest possible workststions with labor to produce units per day without using overtime What is the efficiency of this new assembly line layout? Round to decimal places
F In your new layout, how many workstations include labor
GCan this assembly line layout fit on the existing position conveyor belt system?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock