Question: A wind farm developer is required to construct a wind farm. The developer is restricted to install 1 1 wind turbines in each row. The
A wind farm developer is required to construct a wind farm. The developer is restricted to install wind turbines in each row. The radius of the turbines is m To achieve square arrangement, the separation factor is specified to be Calculate the area of the land required to build the wind farm in km