Question: A) Work Breakdown Structure (WBS) Working in collaboration with the team; develop a project WES (by project phase or by function)r three levels. including the


A) Work Breakdown Structure (WBS) Working in collaboration with the team; develop a project WES (by project phase or by function)r three levels. including the highest level (project) for both projects. Include the name of the person (or team) responsible for each work package. Copy and paste the WBS below: PROJECT 1 {change}