A work study engineer estimated the normal time
A work study engineer estimated the normal time for a worker who manually assemble kids' toys to be 3 min. Additionally, the engineer estimated that the worker produce 170 units during an 8-hr. Based on this information, the engineer estimated the standard hours accomplished as well as worker efficiency to be as follows: Hstd = 8.9 hrs, Ew= 124% ao Hstd = 8.9 hrs, Ewe 103.2% bo Hstd = 9.9 hrs, Eww106.3% CO Hstd = 8.5 hrs, Ewa 103.2% do Hstd 8.5 hrs, Ewa 106.3% Hstd 9.9 hrs, Eww124% 10