Question: a worker-machine system consists of manual work elements with a total normal time of 1.5 min, and a machine cycle with machine time of 2.4

a worker-machine system consists of manual work

a worker-machine system consists of manual work elements with a total normal time of 1.5 min, and a machine cycle with machine time of 2.4 min, using a PFD allowance factor of 15%, and a machine allowance factor of 30%. How many work units are produced daily (8-hour shift) at standard performance 99.07|| pc