Question: ABC Pumps, a manufacturing facility, operates 6 days per week, 7 hours per day. It has a production rate of 450 fuel pumps per hour.

ABC Pumps, a manufacturing facility, operates 6 days per week, 7 hours per day. It has a production rate of 450 fuel pumps per hour. What is the percent capacity utilization of the facility if it produces 11100 to meet demand next week? Report as a whole number by rounding. Do not include the % sign.

Continuing with ABC Pumps, the quality manager reports that 14% of the fuel pumps are defective. In order to meet the demand of 10600 for next week, what should the planned production level be? Report as a whole number by rounding.