Question: Absolute Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According to the static budget, Absolute expected to incur

 Absolute Systems allocates manufacturing overhead based on machine hours. Each connector

Absolute Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According to the static budget, Absolute expected to incur the following: 'Click the icon to view the static budget information.) During August, Absoluteactually used 600 machine hours to make 95connectors and spent \\( \\$ 5,700 \\) in variable manufacturing costs and \\( \\$ 8,000 \\) in fixed manufacturing overhead costs. Calculate the variable overhead efficiency variance for Absolute. A. \\( \\$ 2,575 \\mathrm{~F} \\) B. \\( \\$ 6,175 \\mathrm{~F} \\) C. \\( \\$ 1,800 \\mathrm{U} \\) D. \\( \\$ 4,375 \\mathrm{~F} \\) Absolute Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According to the static budget, Absolute expected to incur the following: 'Click the icon to view the static budget information.) During August, Absoluteactually used 600 machine hours to make 95connectors and spent \\( \\$ 5,700 \\) in variable manufacturing costs and \\( \\$ 8,000 \\) in fixed manufacturing overhead costs. Calculate the variable overhead efficiency variance for Absolute. A. \\( \\$ 2,575 \\mathrm{~F} \\) B. \\( \\$ 6,175 \\mathrm{~F} \\) C. \\( \\$ 1,800 \\mathrm{U} \\) D. \\( \\$ 4,375 \\mathrm{~F} \\)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!

Q:

\f