Question: ACCT 2332 Hello I need help with this questions can you tell me why I got number 1 wrong thank you value: 25.00 points Kunkel
ACCT 2332
Hello I need help with this questions can you tell me why I got number 1 wrong thank you

value: 25.00 points Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours. Data for the two products for the upcoming year follo: Direct materials cost per unit Direct labor cost per unit Direct labor-hours per unit Number of units produced Mercon Wurcon 10.00 7.00 $ 7.00 10.00 1.40 6.80 1,000 2,000 These products are customized to some degree for specific customers. Required 1. The company's manufacturing overhead costs for the year are expected to be $450,000. Using the company's conventional costing system, compute the unit product costs for the two products. (Do not round intermediate calculation. Round your final answers to 2 decimal places.) Mercon Wurcon Unit product costS 48.40 $53.80; 2. Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year Mercon Wurcon Total Engineering design time (in hours) 2,000 2,000 4,000 Compute the unit product costs for the two products using the proposed ABC system. (Do not round ermediate calculation. Round your final answers to 2 decimal places.) Mercon Wurcon Unit product costS 150.50 $ 175.25
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
