Question: ACCT A334 Spring 2022 = Homework: Ch 8 Homework Question 1, E8-27 (similar to) Part 1 of 13 Eyosias Teshome 02/18/22 9:04 PM HW Score:
ACCT A334 Spring 2022 = Homework: Ch 8 Homework Question 1, E8-27 (similar to) Part 1 of 13 Eyosias Teshome 02/18/22 9:04 PM HW Score: 0%, 0 of 28 points Points: 0 of 5 Save The Tavarez Company uses standard costing in its manufacturing plant for auto parts. The standard cost of a particular auto part, based on a denominator level of 3,800 output units per year, included 5 machine-hours of variable manufacturing overhead at $8 per hour and 5 machine-hours of fixed manufacturing overhead at $15 per hour. Actual output produced was 4,100 units. Variable manufacturing overhead incurred was $245,000. Fixed manufacturing overhead incurred was $385,000. Actual machine-hours were 30,000. Read the requirements. Requirement 1. Prepare an analysis of all variable manufacturing overhead and fixed manufacturing overhead variances, using the 4-variance analysis. Begin by calculating the following amounts for the variable overhead. Variable OH Actual Input Actual Costs Incurred Budgeted Rate Flexible Budget Allocated Overhead Requirements 1. Prepare an analysis of all variable manufacturing overhead and fixed manufacturing overhead variances, using the 4-variance analysis. 2. Prepare journal entries using the 4-variance analysis. 3. Describe how individual fixed manufacturing overhead items are controlled from day to day. 4. Discuss possible causes of the fixed manufacturing overhead variances. Print Done
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
