Question: Acme manufacturing uses a batch process (batch size =30 units) to produce machined components to Buff Aerospace. The company runs a single shift per day

Acme manufacturing uses a batch process (batch size =30 units) to produce machined components to Buff Aerospace. The company runs a single shift per day (480 minutes) The current production process along with the cycle time per unit is shown below What would be the maximum output per day if they were to convert to one-piece flow? 94 96 45