Question: Activity 12.1 and Assignment 12.1 Conduct a Process Capability Ratio analysis. Each member of the team needs tocollectsamplesto prepare 10 samples from two processes. Determine

Activity 12.1 and Assignment 12.1

Conduct a Process Capability Ratio analysis.

Each member of the team needs tocollectsamplesto prepare 10 samplesfrom two processes. Determine which process is more consistent and if both are running within specification using Cpk.

Activity 12.1 and Assignment 12.1 Conduct a Process Capability Ratio analysis.Each memberof the team needs tocollectsamplesto prepare 10 samplesfrom two processes. Determine which

Process Capability Report for Weight Fette 3090i LSL USL Process Data Overall LSL 61 Within Target USL 610 Overall Capability Sample Mean 605.96 Pp 39.61 Sample N 10 PPL 78.64 StDev(Overall) 2.30998 PPU 0.58 StDev(Within) 1.77245 Ppk 0.58 Cpm Potential (Within) Capability Cp 51.62 CPL 102.49 CPU 0.76 Cpk 0.76 72 144 216 288 360 432 504 576 Performance Observed Expected Overall Expected Within PPM USL 0.00 40151.20 11323.85 PPM Total 0.00 40151.20 11323.85\f

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!