Question: Activity Description Actual cost Optimistic Most likely Time 4 6 Pessimistic Time 8 Normal Cost 36000 Task completed 100 38000 B 5 7 15 24000

Activity Description Actual cost Optimistic Most

Activity Description Actual cost Optimistic Most likely Time 4 6 Pessimistic Time 8 Normal Cost 36000 Task completed 100 38000 B 5 7 15 24000 100 22000 4 8 12 16000 80 13000 D 15 20 25 20000 60 14000 Select the computer model Design input/output system Design Monitoring system Assemble computer hardware Develop the main programme Develop input/output routine Create database Install the system Test and implement E 10 18 26 9000 70 6000 F 8 9 16 10000 0 G H 1 4 1 6 8 2 7 12 3 8 24000 16000 21000 0 10 0 8000 From the previous experience, it is clear to your company that selection of computer model must be done before designing input/output system and design monitoring system. The company can assemble computer system and develop the main programme only when it has designed input/output system appropriately. On the other hand, developing input/output routine requires that the company has already designed monitoring system. Once the main programme is developed, the company can create data base. But, to install the system, both assemble computer system and development of input/output routine must remain completed. Finally, the testing and implementation stage require that the company has already created database and installed the system. Requirement: i. Using PERT method, determine the critical path and compute the expected completion time. ii. Determine the average daily cost for each activity and the probability that the project will be completed within maximum 53 days. iii. After 30 days, you have calculated the percentage of tasks completed (see percentage of task completed column). Determine whether the project is going as planned or not. Suggest your policy. Activity Description Actual cost Optimistic Most likely Time 4 6 Pessimistic Time 8 Normal Cost 36000 Task completed 100 38000 B 5 7 15 24000 100 22000 4 8 12 16000 80 13000 D 15 20 25 20000 60 14000 Select the computer model Design input/output system Design Monitoring system Assemble computer hardware Develop the main programme Develop input/output routine Create database Install the system Test and implement E 10 18 26 9000 70 6000 F 8 9 16 10000 0 G H 1 4 1 6 8 2 7 12 3 8 24000 16000 21000 0 10 0 8000 From the previous experience, it is clear to your company that selection of computer model must be done before designing input/output system and design monitoring system. The company can assemble computer system and develop the main programme only when it has designed input/output system appropriately. On the other hand, developing input/output routine requires that the company has already designed monitoring system. Once the main programme is developed, the company can create data base. But, to install the system, both assemble computer system and development of input/output routine must remain completed. Finally, the testing and implementation stage require that the company has already created database and installed the system. Requirement: i. Using PERT method, determine the critical path and compute the expected completion time. ii. Determine the average daily cost for each activity and the probability that the project will be completed within maximum 53 days. iii. After 30 days, you have calculated the percentage of tasks completed (see percentage of task completed column). Determine whether the project is going as planned or not. Suggest your policy

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!