Question: Activity Duration Preceded By A 3 B 9 A C 7 A D 5 B E 5 F. 1 E The Total Float of Activity

 Activity Duration Preceded By A 3 B 9 A C 7

Activity Duration Preceded By A 3 B 9 A C 7 A D 5 B E 5 F. 1 E The Total Float of Activity E is: Select one: None of the given answers 0 It depends on its predecessor 1 It depends on its successor