Question: Activity Optimistic Most Likely Pessimistic A 13 4 15 B 6 14 19 12 0.5 1.5 10 minm 12 11 B E G Finish D


Activity Optimistic Most Likely Pessimistic A 13 4 15 B 6 14 19 12 0.5 1.5 10 minm 12 11 B E G Finish D Start F A C Determine: (a) the critical path. (b) the probability that the project will be completed in 22 weeks