Question: Activity Predecessor Optimistic Most Likely Pessimistic Duration Standard Deviation Duration in Months A 4 7 10 B 7 5.5 7 C 25 33 41 D

Activity Predecessor Optimistic Most Likely Pessimistic Duration Standard Deviation
Duration in Months
A 4 7 10
B 7 5.5 7
C 25 33 41
D B 20 23 32
E C 1 2 15.5
F D 4 7 22
G A, B 22 10 10
H E 5 9 19
I G 4 3 26
J F, G 12 7 20

Use the information above and draw a network diagram showing the L/S, E/S, E/F, L/F, Slack, and Critical Path