Question: After reading an article about activity-based costing in a trade journal for the furniture industry, Santana Rey decides to analyze overhead cost at Business Solutions.

After reading an article about activity-based costing in a trade journal for the furniture industry, Santana Rey decides to analyze overhead cost at Business Solutions. In a recent month, Santana found that setup costs, inspection costs, and utility costs made up most of the companys overhead. Additional information about overhead follows.

Activity Budgeted Cost Budgeted Activity Usage
Set up $ 17,940 23 setups
Inspection 4,500 4,500 parts inspected
Utilities 9,000 4,500 machine hours (MH)
Total $ 31,440

The following data pertain to Job 615.

Direct materials $ 2,200
Direct labor $ 3,500
Overhead $ _____
Setups 3 setups
Parts inspected 430 parts inspected
Machine hours 630 machine hours

Required: 1. Classify each of the three overhead activities as unit level, batch level, product level, or facility level. 2. Assume Business Solutions allocates overhead cost using a plantwide rate based on 4,500 machine hours. Compute total product cost of Job 615. 3. Assume Business Solutions uses activity-based costing. (a) Compute overhead activity rates. (b) Allocate overhead cost to Job 615. (c) Compute total product cost of Job 615.

After reading an article about activity-based costing in a trade journal forthe furniture industry, Santana Rey decides to analyze overhead cost at BusinessSolutions. In a recent month, Santana found that setup costs, inspection costs,

Classify each of the three overhead activities as unit level, batch level, product level, or facility level. Assume Business Solutions allocates overhead cost using a plantwide rate based on 4,500 machine hours. Compute total product cost of Job 615. (Do not round intermediate calculations. Round "Overhead rate" to 2 decimal places. Round other answers to nearest whole number.) Assume Business Solutions uses activity-based costing. (a) Compute overhead activity rates. (b) Allocate overhead cost to Job 615. (c) Compute total product cost of Job 615. (Round "Activity Rate" to 2 decimal places.)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!