Question: Ali is an engineer who was recently assigned as a project manager to build a private villa. He has developed the below table. Code Activities
Ali is an engineer who was recently assigned as a project manager to build a private villa. He has developed the below table.
| Code | Activities | Duration Days | Predecessors |
| A | Draw a draft for the villa design | 5 | No predecessor |
| B | Obtain the owners approval | 3 | A |
| C | Assign the contractor | 7 | B |
| D | Assign the interior designer | 4 | B |
| E | Finalize the contract | 5 | D and C |
Kindly assist Ali to do the following:
- Draw a Network Diagram
- Find the Critical Path
- Find the Early Start and Early Finish
- Find the Late Start and Late finish
- Find the float