Question: An analyst has timed a metal - cutting operation for 5 0 cycles. The observed avaerage times per cycles was 1 0 . 4 0

An analyst has timed a metal-cutting operation for 50 cycles. The observed avaerage times per cycles was 10.40 minutes and the standrad devation was 1.20 minutes for a worker with a performance rating of 125 percent. Assume and allowance percenatge of 16 percent of job time. Find the standard time for this operation.