Question: An analyst has timed a metal - cutting task for 5 0 cycles. The average time per cycle was 1 1 . 6 minutes, and

An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 11.6 minutes, and the standard deviation was 1.26 minutes for a worker with a performance rating of 140 percent. Assume an allowance of 14 percent of task time. Calculate the standard time for this task. (Do not round intermediate calculations. Round the final answer to 2 decimal places. Calculations are needed for grading).