Question: An assambly line has three work stalions ( A . B ) and ( C ). The materials move from ( A ) to (

An assambly line has three work stalions \( A . B \) and \( C \). The materials move from \( A \) to \( B \) and then to \( C \). Station \( A \) takes 2 minutes, \( B 3 \) minutes and \( C \) 5 minis 