Question: An assembly line with 1 7 tasks is to be balanced. The longest task is 2 . 4 minutes , and the total time for

An assembly line with
1
7
tasks is to be balanced. The longest task is
2
.
4
minutes, and the total time for all tasks is
1
8
minutes. The line will operate for
4
5
0
minutes per day.
a
.
what are the minimum and maximum cycle times?