Question: An assembly line with 12 separate tasks is to be balanced. The longest task is 2.5 minutes, and total time for all tasks is 24

An assembly line with 12 separate tasks is to be balanced. The longest task is 2.5 minutes, and total time for all tasks is 24 minutes. The line operates for 480 minutes per day. 7.2.1. What are the minimum and maximum cycle times? (2 marks) 7.2.2. What range of output is theoretically possible for this line?