Question: An assembly line with 11 tasks is to be balanced. The longest task is 2.4 minutes, the shortest task is 0.4 minutes, and the sum

An assembly line with 11 tasks is to be balanced.

An assembly line with 11 tasks is to be balanced. The longest task is 2.4 minutes, the shortest task is 0.4 minutes, and the sum of the task times is 18 minutes. The line will operate for 600 minutes per day. The minimum cycle time is __ and maximum cycle time is O A. 0.4 minutes and 2.4 minutes O B. 2.4 minutes and 18 minutes O C. 18 minutes and 600 minutes D. 4.8 minutes and 18 minutes O E. 0.4 minutes and 2.4 minutes