Question: An assembly line with 15 tasks is to be balanced. The longest task is 2.5 minutes, and the total time for all tasks is 14

An assembly line with 15 tasks is to be balanced.

An assembly line with 15 tasks is to be balanced.

An assembly line with 15 tasks is to be balanced. The longest task is 2.5 minutes, and the total time for all tasks is 14 minutes. The line will operate for 446 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.) Answer is complete and correct. Minimum cycle time Maximum cycle time 2.5 minutes 140 minutes b. What range of output is theoretically possible for the line? (Round your answers to whole numbers.) * Answer is complete but not entirely correct. 149 X Minimum output Maximum output 31 X c. What is the minimum number of workstations needed if the maximum output rate is to be sought? (Round your answer up to a whole number.) Answer is complete and correct. Minimum number of workstations 6 d. What cycle time will provide an output rate of 127 units per day? (Round your answer to 1 decimal place.) Cycle time minutes per cycle e. What output potential will result for the following cycle times? (Round your answers to whole numbers.) Answer is complete and correct. 9 minutes 50 26 17 minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!