Question: An assembly line with 3 3 operations is to be balanced. The total amount of tirn required for all operations is 5 9 minutes. The
An assembly line with operations is to be balanced. The total amount of tirn required for all operations is minutes. The longest operation takes minutes and the shortest takes minutes. The line will operate for minutes per day. What is the output rate if the cycle time is set at minutes? Round the output rat to the closest whole number.