Question: An assembly line with 8 tasks is to be balanced. The longest task is 12 minutes, and the total time for all tasks is 48

An assembly line with 8 tasks is to be balanced. The longest task is 12 minutes, and the total time for all tasks is 48 minutes. The line will operate for 480 minutes per day. Round up your answers to the nearest whole number (40 points, 10 points each). See Lecture M4-2 for details