Question: An assembly operates for 8 hours per shift, 2 shifts per day, 7 days a week. The product that is assembled requires 16 tasks to
An assembly operates for 8 hours per shift, 2 shifts per day, 7 days a week. The product that is assembled requires 16 tasks to be completed. The longest task is takes 8 minutes, the shortest task takes 3 minutes, and the sum of the tasks times is 88 minutes. What is the minimum possible cycle time? What is the maximum possible cycle time? What is the maximum possible number of stations? What is the minimum number of stations? What is the minimum possible weekly output? What is the maximum possible weekly output