Question: an asset has a basic cost of 5000 and zero market value at the end of 5 years. if swith over is perfomed between SL

an asset has a basic cost of 5000 and zero market value at the end of 5 years. if swith over is perfomed between SL and 200% DB. the book value of the asset at the begging of year 4 is a. 648 b. 1000 1080 De 1200