Question: An efficiency study showed that the typical assembly worker at a company built their products at the rate of f(t) = -3/2 t^2 +9t +

 An efficiency study showed that the typical assembly worker at a

An efficiency study showed that the typical assembly worker at a company built their products at the rate of f(t) = -3/2 t^2 +9t + 48 (0 t 8) items per hour t hours after starting work during their shift. Evaluate and interpret the average rate of change in worker productivity from the first to the third hour of shift work