Question: An electronic device assembly requires the following activities: Activity Time (in seconds) A 12 B 15 C 18 D 36 E 12 F 18 G
An electronic device assembly requires the following activities:
| Activity | Time (in seconds) |
| A | 12 |
| B | 15 |
| C | 18 |
| D | 36 |
| E | 12 |
| F | 18 |
| G | 36 |
a) If the desired output is 525 units per shift, and a shift has 7 hours of effective time, what is the cycle time?
b) What is the minimum number of workstations needed?