An electronics company is engaged in the production of two components C and C, used in...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
An electronics company is engaged in the production of two components C₁ and C₂, used in radio sets. Each unit of C₁ costs the company 5 in wages and 5 in materials, while each unit of C₂ costs the company * 25 in wages and 15 in materials. The company sells both products on one-period credit terms, but the company's labour and material expenses must be paid in cash. The selling price of C₁ is * 30 per unit and of C₂ it is 70. Because of the strong monopoly of the company for these components, it is assumed that the company can sell at the prevailing prices as many units as it produces. The company's production capacity is, however, limited by two considerations. First, at the beginning of period 1, the company has initial balance of 4,000 (cash plus bank credit plus collections from past credit sales). Secondly, the company has available, in each period, 2,000 hours of machine time and 1,400 hours of assembly time. The production of each C₁ requires three hours of machine time and two hours of assembly time, whereas the production of each C₂ requires two hours of machine time and three hours of assembly time. Formulate the above problem as a linear programming problem. An electronics company is engaged in the production of two components C₁ and C₂, used in radio sets. Each unit of C₁ costs the company 5 in wages and 5 in materials, while each unit of C₂ costs the company * 25 in wages and 15 in materials. The company sells both products on one-period credit terms, but the company's labour and material expenses must be paid in cash. The selling price of C₁ is * 30 per unit and of C₂ it is 70. Because of the strong monopoly of the company for these components, it is assumed that the company can sell at the prevailing prices as many units as it produces. The company's production capacity is, however, limited by two considerations. First, at the beginning of period 1, the company has initial balance of 4,000 (cash plus bank credit plus collections from past credit sales). Secondly, the company has available, in each period, 2,000 hours of machine time and 1,400 hours of assembly time. The production of each C₁ requires three hours of machine time and two hours of assembly time, whereas the production of each C₂ requires two hours of machine time and three hours of assembly time. Formulate the above problem as a linear programming problem.
Expert Answer:
Related Book For
Cornerstones of Cost Management
ISBN: 978-1285751788
3rd edition
Authors: Don R. Hansen, Maryanne M. Mowen
Posted Date:
Students also viewed these mathematics questions
-
An electronics company is planning to introduce a new camera phone. The company commissions a marketing report for each new product that predicts either the success or the failure of the product. Of...
-
In 2006, Anheuser-Busch Companies Inc. (BUD) engaged in the production and distribution of beer worldwide, operating through four business segments: domestic beer, international beer, packaging, and...
-
The Miller- Lyons Electric Company is engaged in a rate case with the local regulatory commission. The demand curve for the firm's product is P = 1,000 2Q where P is price per unit of output (in...
-
You are given two planes in parametric form, x1 x2 1 x3 where x1, x2, 3, , 2, 1,42 R. Let I be the line of intersection of II and II2. a. Find vectors n and no that are normals to II and II 2 must...
-
What are the problems associated with software obsolescence?
-
In a 2012 book, The New Geography of Jobs (a book described by Barack Obama as 'a timely and smart discussion of how different cities and regions have made a changing economy work for them', and by...
-
State Daltons law of partial pressures.
-
1. What has a larger impact on Palmstars profits, delaying the 2000 c s introduction by 3 months or increasing the project s budget by 30 percent? 2. Are there other factors you would consider in...
-
Appendix V Current Job Information Smoke Damage Comm. Water Damage Other Total Total Res. Comm. Res. Comm. Res. Comm. Res. 2,542.00 120,000.00 394.00 270,000.00 Revenue Overhead cost allocated Direct...
-
1 What are the main components of personal financial planning? Solve What is the purpose of a financial plan? Solve Identify some common actions taken to achieve financial goals. How does a job...
-
The Vanilla Miracle OHG dairy has specialized in the production of vanilla milk. Raw milk is purchased from regional farms for a fixed price of 41 cents per liter and heated to ultra-high temperature...
-
Extend the class GraphType in this chapter to include a DeleteVertex operation, which deletes a vertex from the graph. Deleting a vertex from a graph is more complicated than deleting an edge....
-
1. Declare a two-dimensional array, decadeWeather, of WeatherType components, to be indexed by values of type MonthType in the first dimension. 2. Draw a picture of decadeWeather. 3. Assign the value...
-
1. Write a nonrecursive version of ReheapDown. 2. Write a nonrecursive version of ReheapUp. 3. Describe the nonrecursive versions of these operations in terms of Big-O notation.
-
True or False? When performing a Find operation on a map, if the item is not present, then the value in the returned ItemType object is the same as what was passed into the function.
-
How could a map be used to implement the Set ADT?
-
Mike, one of the marketing strategists on your team, stops at your office door wanting to talk. "We use fabrics that are made domestically; however, there are issues with using these same fabrics...
-
The Strahler Stream Order System ranks streams based on the number of tributaries that have merged. It is a top-down system where rivers of the first order are the headwaters (aka outermost...
-
Mulhall, Inc., has a JIT system in place. Each manufacturing cell is dedicated to the production of a single product or major subassembly. One cell, dedicated to the production of mopeds, has four...
-
Joseph Hansen, president of Electronica, Inc., was concerned about the end-of-the-year marketing report that he had just received. According to Kylee Hepworth, marketing manager, a price decrease for...
-
Clanahan, Inc., has a number of divisions around the world. Division US (in the United States) purchases a component from Division N (in the Netherlands). The component can be purchased externally...
-
Which of the following are boiler mountings ? (a) Economiser (b) Fusible plug (c) Super heater (d) Injector
-
Which out of the following boiler is capable of generating superheated steam without additional accessories ? (a) Cochran (b) Lancashire (c) Locomotive (d) Cornish
-
The economiser of the boiler plant is used mainly to (a) increase steam capacity (b) reduce fuel consumption (c) increase steam pressure (d) increase life of the boiler
Study smarter with the SolutionInn App