Question: An engineer is having some work done to his house by a contractor. The contractor uses various trade specialists to perform a process. The contractor
An engineer is having some work done to his house by a contractor. The contractor uses various trade specialists to perform a process. The contractor is venting to the engineer about projects costs and some of the challenges particularly between two (2) trade specialists. The engineer believes part of this can be solved be seeing if there is any variation between the two (who offer the same services). Assuming you are said engineer, conduct the analysis using alpha = 0.10 or 10% to see if their is a difference in the variation between time(s) taken for tradesperson A vs. B
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
