Question: ? An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment

?
An engineer must decide between two ways to pump concrete to the

An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $19000 per year. In addition, an extra $13.50 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 65.0 days per year? The MARR is 11.00% per year. (Round the final answers to three decimal places.) (Include a minus sign if necessary.) The annual worth of plan 1 lease optimistic is $ The annual worth of plan 1 most likely is $ The annual worth of plan 1 pessimistic is $ The annual worth of plan 2 rental is $ than rental of plan 2. Plan 1 lease optimistic is better Plan 1 most likely is better than rental of plan 2. Plan 1 lease pessimistic is better than rental of plan 2.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!