Question: An engineering firm has been having a maintenance problem with the control panel for one of its production processes. This control panel contains four identical

 An engineering firm has been having a maintenance problem with the

An engineering firm has been having a maintenance problem with the control panel for one of its production processes. This control panel contains four identical electromechanical relays that have been the cause of the trouble. The problem is that the relays fail fairly frequently, thereby forcing the control panel (and the production process it controls) to be shut down while a replacement is made. The current practice is to replace the relays only when they fail. The cost of doing this has been $20.00 per hour. To attempt to reduce this cost, a proposal has been made to replace all four relays whenever any one of them fails to reduce the frequency with which the control panel must be shut down. Would this actually reduce the cost? For each relay, the operating time until failure has approximately a uniform distribution from 1,000 to 2,000 hours. The control panel must be shut down for one hour to replace one relay or for two hours to replace all four relays. The total cost associated with shutting down the control panel and replacing relays is $5,000 per hour plus $400 for each new relay. Use simulation to evaluate the cost of the proposal and compare it to the current practice. Simulate for 11 consecutive replacements of four relays (where the end of each trial coincides with the end of a shut-down of the control panel) and determine the cost per hour of operation. Trials 1 2 3 4 5 6 7 8 9 10 11 Total Time to failure relay 1 1,500 1,300 1,000 1,600 1.900 1,100 1,400 1,700 2,000 1,800 1,200 Time to failure relay 2 1,300 1,200 1,800 1,600 1,000 1,700 2,000 1,100 1,500 1,400 1,900 Time to failure relay 3 2,000 1,300 1,600 1,100 1,900 1,800 1,700 1.500 1,400 1,200 1,300 Time to failure relay 4 1,800 1,600 1,200 1,000 1,500 2,000 1,300 1.900 1,100 1,400 1,700 An engineering firm has been having a maintenance problem with the control panel for one of its production processes. This control panel contains four identical electromechanical relays that have been the cause of the trouble. The problem is that the relays fail fairly frequently, thereby forcing the control panel (and the production process it controls) to be shut down while a replacement is made. The current practice is to replace the relays only when they fail. The cost of doing this has been $20.00 per hour. To attempt to reduce this cost, a proposal has been made to replace all four relays whenever any one of them fails to reduce the frequency with which the control panel must be shut down. Would this actually reduce the cost? For each relay, the operating time until failure has approximately a uniform distribution from 1,000 to 2,000 hours. The control panel must be shut down for one hour to replace one relay or for two hours to replace all four relays. The total cost associated with shutting down the control panel and replacing relays is $5,000 per hour plus $400 for each new relay. Use simulation to evaluate the cost of the proposal and compare it to the current practice. Simulate for 11 consecutive replacements of four relays (where the end of each trial coincides with the end of a shut-down of the control panel) and determine the cost per hour of operation. Trials 1 2 3 4 5 6 7 8 9 10 11 Total Time to failure relay 1 1,500 1,300 1,000 1,600 1.900 1,100 1,400 1,700 2,000 1,800 1,200 Time to failure relay 2 1,300 1,200 1,800 1,600 1,000 1,700 2,000 1,100 1,500 1,400 1,900 Time to failure relay 3 2,000 1,300 1,600 1,100 1,900 1,800 1,700 1.500 1,400 1,200 1,300 Time to failure relay 4 1,800 1,600 1,200 1,000 1,500 2,000 1,300 1.900 1,100 1,400 1,700

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!