Question: An engineering is trying to determine whether a current process is capable of meeting the design specifications of a new product. The component that needs
An engineering is trying to determine whether a current process is capable of meeting the design specifications of a new product. The component that needs to be manufacturing as an Upper Specification limit of 132.95mm and a Lower Specification Limit of 132.05mm. The standard deviation of the process is 0.357.
Calculate the process capability using the Cp measure. Is the process capable?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts