Question: An industrial engineer conducts a stopwatch study for a warehouse operator packing a multi-item order. The recorded times, in minutes, are as follows: 3 minutes
An industrial engineer conducts a stopwatch study for a warehouse operator packing a multi-item order. The recorded times, in minutes, are as follows: 3 minutes 4 minutes 2 minutes 3 minutes 1 minute Calculate the Observed Time (OT)